Case Studies

Real deployments. Real logistics challenges. Here is how we solved them.

Construction

Highway Construction Office Complex — Denver Metro, CO

6-month project · 3 office trailers · Full site support

Challenge

A 6-month highway project needed three office trailers with water, waste, power, restrooms, and security at a site with zero utility infrastructure. The PM was coordinating five different vendors and three different service schedules.

Solution

We provided Water Boxes, Waste Boxes, a 30 kW generator with fuel storage, an 8-stall restroom trailer, and a solar surveillance trailer — all as one package with one delivery and one weekly service schedule.

Result

One vendor replaced five. Weekly service handled all equipment. PM estimated 4 hours per week saved on vendor coordination alone.

Disaster Response

Emergency Operations Center — Western NC

48-hour deployment · Full compound · 3-week operation

Challenge

After a major storm, emergency management needed a functional operations center within 48 hours — office trailers with power, water, restrooms, and conference capability at a site where local infrastructure was destroyed.

Solution

We deployed a 50 kW generator, Water Boxes, restroom and shower trailers, and office trailers with conference room packages within 36 hours through our national logistics network.

Result

Fully operational command post within 36 hours. Self-contained operation for 3 weeks until local utilities were restored.

Remote Site

Pipeline Construction Camp — Billings, MT

6-month deployment · 80-person crew · Fully self-contained

Challenge

A remote pipeline project 45 minutes from the nearest town needed office trailers, crew facilities, water, waste, power, and fuel storage that would operate independently for 6 months.

Solution

Complete site package: Water Boxes, Waste Boxes, 40 kW generator with 500-gallon fuel storage, 8-stall shower trailer, restroom trailer, and breakroom trailer. Monthly service contract with weekly visits.

Result

Sustained site operations for the full 6-month project. Zero disruption. Weekly service handled all maintenance.

Have a Similar Project?

Tell us about your deployment. We will recommend the right equipment package.